The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Bitumen grade 80/100 indicates that under the ...
➣ Dip of the needle : ...
➣ What is the psychological widening of pavement ...
➣ Errors which remain after mistakes and systematic ...
➣ Metallic tapes are made of : ...
➣ Shift of the transition curve of radius ...
➣ Which of the following statement (s) is/are ...
➣ If free mean speed on a roadway ...
➣ For a constant value of co-efficient of ...
➣ A rotary will be more suitable than ...
❖ Take a qick MCQ Test on
➤ Hydrology
➤ Transportation Engineering
➤ Irrigation
➤ Concrete Structure
➤ Fluid Mechanics and Hydraulics
➤ Steel Structure
➤ Water Supply
➤ Strength of Material