The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ For design, that length of transition curve ...
➣ Prismatic compass and surveyor's compass respectively given ...
➣ The position of point can be fixed ...
➣ What is the mechanical widening required for ...
➣ A field is measured with a 1.0 ...
➣ Maximum allowable limit upto that a measurement ...
➣ The effect of grade on safe overtaking ...
➣ On a horizontal curve, if the pavement ...
➣ Chainage is the distance measured : ...
➣ In a closed traverse : ...
❖ Take a qick MCQ Test on
➤ Transportation Engineering
➤ Strength of Material
➤ Hydrology
➤ Concrete Structure
➤ Irrigation
➤ Fluid Mechanics and Hydraulics
➤ Water Supply
➤ Miscellaneous