♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Clearance distance or set back distance required ...
➣ For a constant value of co-efficient of ...
➣ For detecting whether a bitumen is cracked ...
➣ On a right angled road inter-section with ...
➣ If in a Dorry abrasion test the ...
➣ A building is an obstacles to : ...
➣ Shift of the transition curve of radius ...
➣ Metallic tapes are made of : ...
➣ 30th highest hour volumes is : ...
➣ A vehicle moving at 40 kmph speed ...
❖ Take a qick MCQ Test on
➤ Hydrology
➤ Water Supply
➤ Concrete Technology
➤ Concrete Structure
➤ Building Material
➤ Pollution (Air and Noise)
➤ Fluid Mechanics and Hydraulics
➤ Irrigation