The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ For a constant value of co-efficient of ...
➣ What is the mechanical widening required for ...
➣ With increase in speed of the traffic ...
➣ Length of a vehicle affects : ...
➣ The closing error in a traverse is ...
➣ In a closed traverse : ...
➣ Metallic tapes are made of : ...
➣ Length of summit curve for a stopping ...
➣ In a braking test, a vehicle travelling ...
➣ Which of the following statement (s) is/are ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Miscellaneous
➤ Steel Structure
➤ Soil Mechanics and Foundation
➤ Fluid Mechanics and Hydraulics
➤ Water Supply
➤ Hydrology
➤ Pollution (Air and Noise)