♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ While aligning a hill road with a ...
➣ Chain surveying is used for : ...
➣ Normal tension is that pull which : ...
➣ Chainage is the distance measured : ...
➣ On a right angle road inter-section with ...
➣ A negative declination shows the magnetic meridian ...
➣ Permissible limits of error in chaining of ...
➣ Maximum allowable limit upto that a measurement ...
➣ Gravity model is used in transportation planning ...
➣ Length of transition curve for design speed ...
❖ Take a qick MCQ Test on
➤ Steel Structure
➤ Irrigation
➤ Solid Waste and Waste Water Treatment
➤ Soil Mechanics and Foundation
➤ Strength of Material
➤ Miscellaneous
➤ Pollution (Air and Noise)
➤ Water Supply