Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ A 30m chain was found to be ...
➣ A river is an obstacle to : ...
➣ Number of links in a 30 m ...
➣ In desire line diagram : ...
➣ A field is measured with a 1.0 ...
➣ Positive error is caused if : ...
➣ As per IRG-recommendation, the average level of ...
➣ Obstacle to ranging but not chaining is ...
➣ Method of offset laying involving minimum measurement ...
➣ Invar tapes are made of an alloy ...
❖ Take a qick MCQ Test on
➤ Concrete Structure
➤ Steel Structure
➤ Solid Waste and Waste Water Treatment
➤ Building Material
➤ Water Supply
➤ Irrigation
➤ Fluid Mechanics and Hydraulics
➤ Soil Mechanics and Foundation