The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ For accurate work,in comparison to chain, the ...
➣ Which of the following is taken into ...
➣ Number of links in a 30 m ...
➣ A 30m chain was found to be ...
➣ Positive error is caused if : ...
➣ If free mean speed on a roadway ...
➣ A field is measured with a 1.0 ...
➣ In survey works declinations varies from time ...
➣ Shift of the transition curve of radius ...
➣ Dip of the needle : ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Building Material
➤ Miscellaneous
➤ Steel Structure
➤ Fluid Mechanics and Hydraulics
➤ Soil Mechanics and Foundation
➤ Surveying
➤ Concrete Structure