The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ On a right angled road inter-section with ...
➣ In which of the following traffic signal ...
➣ In which of the following traffic signal ...
➣ With regards to traversing : ...
➣ The sag correction is always : ...
➣ For detecting whether a bitumen is cracked ...
➣ Number of links in a 30 m ...
➣ The main difference between optical square and ...
➣ Negative errors are caused in chain, when ...
➣ Maximum allowable limit upto that a measurement ...
❖ Take a qick MCQ Test on
➤ Transportation Engineering
➤ Strength of Material
➤ Pollution (Air and Noise)
➤ Fluid Mechanics and Hydraulics
➤ Concrete Technology
➤ Building Material
➤ Irrigation
➤ Steel Structure