The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The sag correction is always : ...
➣ A rotary will be more suitable than ...
➣ Open cross staff is used for setting ...
➣ An offset more than 15 m length ...
➣ If average centre to centre spacing of ...
➣ The entrance and exit curves of a ...
➣ When speed of traffic flow becomes zero, ...
➣ Secular variation is important is important factor ...
➣ A 30m chain was found to be ...
➣ Duirnal variation depends upon : ...
❖ Take a qick MCQ Test on
➤ Strength of Material
➤ Concrete Structure
➤ Steel Structure
➤ Building Material
➤ Soil Mechanics and Foundation
➤ Transportation Engineering
➤ Fluid Mechanics and Hydraulics
➤ Solid Waste and Waste Water Treatment