The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Number of links in a 30 m ...
➣ For accurate work,in comparison to chain, the ...
➣ Prismatic compass and surveyor's compass respectively given ...
➣ With increase in speed of the traffic ...
➣ If in a Dorry abrasion test the ...
➣ As per IRG-recommendation, the average level of ...
➣ Which of the following is taken into ...
➣ If ruling gradients is 1 in 20 ...
➣ Quadrantal system confines the user to measure ...
➣ Invar tapes are made of an alloy ...
❖ Take a qick MCQ Test on
➤ Transportation Engineering
➤ Miscellaneous
➤ Soil Mechanics and Foundation
➤ Surveying
➤ Building Material
➤ Pollution (Air and Noise)
➤ Concrete Technology
➤ Solid Waste and Waste Water Treatment