The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ A negative declination shows the magnetic meridian ...
➣ If ruling gradients is 1 in 20 ...
➣ As per IRG-recommendation, the average level of ...
➣ Which of the following statements is/are correct ...
➣ Which of the following is taken into ...
➣ For accurate work,in comparison to chain, the ...
➣ A 30m chain was found to be ...
➣ The best binder material to be used ...
➣ In which of the following traffic signal ...
➣ What is the off-tracking of a vehicle ...
❖ Take a qick MCQ Test on
➤ Miscellaneous
➤ Solid Waste and Waste Water Treatment
➤ Pollution (Air and Noise)
➤ Water Supply
➤ Irrigation
➤ Steel Structure
➤ Soil Mechanics and Foundation
➤ Strength of Material