The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ On a right angle road inter-section with ...
➣ Which of the following statement (s) is/are ...
➣ For accurate work,in comparison to chain, the ...
➣ The entrance and exit curves of a ...
➣ Duirnal variation depends upon : ...
➣ For detecting whether a bitumen is cracked ...
➣ For design, that length of transition curve ...
➣ A field is measured with a 1.0 ...
➣ Drive ways aire : ...
➣ On the right angled road inter-section with ...
❖ Take a qick MCQ Test on
➤ Pollution (Air and Noise)
➤ Concrete Technology
➤ Solid Waste and Waste Water Treatment
➤ Steel Structure
➤ Strength of Material
➤ Water Supply
➤ Irrigation
➤ Surveying