The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The base line is measured with : ...
➣ Inclination of the needle to the horizontal ...
➣ The best binder material to be used ...
➣ True meridians : ...
➣ For design, that length of transition curve ...
➣ The position of point can be fixed ...
➣ If ruling gradients is 1 in 20 ...
➣ On the right angled road inter-section with ...
➣ Obstacle to ranging but not chaining is ...
➣ Dip of the needle : ...
❖ Take a qick MCQ Test on
➤ Strength of Material
➤ Hydrology
➤ Pollution (Air and Noise)
➤ Soil Mechanics and Foundation
➤ Building Material
➤ Concrete Structure
➤ Irrigation
➤ Transportation Engineering