Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.4K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ With referance to the Marshall mix design ...
➣ In desire line diagram : ...
➣ Limiting length of offset depends upon : ...
➣ Length of transition curve for design speed ...
➣ The best binder material to be used ...
➣ On a right angled road inter-section with ...
➣ An offset more than 15 m length ...
➣ A negative declination shows the magnetic meridian ...
➣ Maximum allowable limit upto that a measurement ...
➣ On a right angle road inter-section with ...
❖ Take a qick MCQ Test on
➤ Steel Structure
➤ Transportation Engineering
➤ Irrigation
➤ Building Material
➤ Miscellaneous
➤ Water Supply
➤ Pollution (Air and Noise)
➤ Strength of Material