Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ A rotary will be more suitable than ...
➣ What is the off-tracking of a vehicle ...
➣ The optical square is based on the ...
➣ On a right angled road inter-section with ...
➣ In which of the following traffic signal ...
➣ A field is measured with a 1.0 ...
➣ The tie line is run throught the ...
➣ Length of summit curve for a stopping ...
➣ For design, that length of transition curve ...
➣ During chaining along straight line,the leader of ...
❖ Take a qick MCQ Test on
➤ Concrete Structure
➤ Irrigation
➤ Pollution (Air and Noise)
➤ Steel Structure
➤ Surveying
➤ Transportation Engineering
➤ Miscellaneous
➤ Water Supply