The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Negative errors are caused in chain, when ...
➣ The sag correction is always : ...
➣ What is the psychological widening of pavement ...
➣ The closing error in a traverse is ...
➣ A vehicle moving at 40 kmph speed ...
➣ With increase in speed of the traffic ...
➣ For accurate work,in comparison to chain, the ...
➣ If free mean speed on a roadway ...
➣ An offset more than 15 m length ...
➣ In desire line diagram : ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Miscellaneous
➤ Concrete Structure
➤ Soil Mechanics and Foundation
➤ Concrete Technology
➤ Strength of Material
➤ Transportation Engineering
➤ Building Material