The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Chainage is the distance measured : ...
➣ As per IRG-recommendation, the average level of ...
➣ The best binder material to be used ...
➣ Chain surveying is used for : ...
➣ An offset more than 15 m length ...
➣ Number of links in a 30 m ...
➣ On a right angle road inter-section with ...
➣ Maximum allowable limit upto that a measurement ...
➣ What is the psychological widening of pavement ...
➣ With referance to the Marshall mix design ...
❖ Take a qick MCQ Test on
➤ Surveying
➤ Concrete Technology
➤ Miscellaneous
➤ Hydrology
➤ Pollution (Air and Noise)
➤ Steel Structure
➤ Building Material
➤ Transportation Engineering