The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Normal tension is that pull which : ...
➣ Metallic tapes are made of : ...
➣ Important points selected at the ends of ...
➣ Method of offset laying involving minimum measurement ...
➣ Obstacle to ranging but not chaining is ...
➣ On the right angled road inter-section with ...
➣ Duirnal variation depends upon : ...
➣ Quadrantal system confines the user to measure ...
➣ Most probable value of an observed quantity ...
➣ Drive ways aire : ...
❖ Take a qick MCQ Test on
➤ Pollution (Air and Noise)
➤ Irrigation
➤ Concrete Technology
➤ Solid Waste and Waste Water Treatment
➤ Building Material
➤ Transportation Engineering
➤ Fluid Mechanics and Hydraulics
➤ Strength of Material