The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ In which of the following traffic signal ...
➣ The base line is measured with : ...
➣ Positive error is caused if : ...
➣ Which of the following statements is/are correct ...
➣ Negative errors are caused in chain, when ...
➣ Chain surveying is used for : ...
➣ In soil stabilisation : ...
➣ In compass surtveying : ...
➣ If ruling gradients is 1 in 20 ...
➣ Chainage is the distance measured : ...
❖ Take a qick MCQ Test on
➤ Water Supply
➤ Hydrology
➤ Concrete Technology
➤ Strength of Material
➤ Miscellaneous
➤ Transportation Engineering
➤ Irrigation
➤ Soil Mechanics and Foundation