♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ In a braking test, a vehicle travelling ...
➣ The best binder material to be used ...
➣ For accurate work,in comparison to chain, the ...
➣ When speed of traffic flow becomes zero, ...
➣ Metallic tapes are made of : ...
➣ In which of the following traffic signal ...
➣ Method of offset laying involving minimum measurement ...
➣ If average centre to centre spacing of ...
➣ With referance to the Marshall mix design ...
➣ Inclination of the needle to the horizontal ...
❖ Take a qick MCQ Test on
➤ Concrete Structure
➤ Soil Mechanics and Foundation
➤ Fluid Mechanics and Hydraulics
➤ Steel Structure
➤ Solid Waste and Waste Water Treatment
➤ Miscellaneous
➤ Pollution (Air and Noise)
➤ Hydrology