♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ What is the off-tracking of a vehicle ...
➣ A river is an obstacle to : ...
➣ Quadrantal system confines the user to measure ...
➣ Which of the following is taken into ...
➣ Compensating errors in chaining are : ...
➣ With increase in speed of the traffic ...
➣ The best binder material to be used ...
➣ What is the mechanical widening required for ...
➣ What is the psychological widening of pavement ...
➣ The chain length which is not the ...
❖ Take a qick MCQ Test on
➤ Transportation Engineering
➤ Pollution (Air and Noise)
➤ Solid Waste and Waste Water Treatment
➤ Soil Mechanics and Foundation
➤ Irrigation
➤ Fluid Mechanics and Hydraulics
➤ Concrete Structure
➤ Building Material