The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ In whole circle system, the bearing are ...
➣ Inclination of the needle to the horizontal ...
➣ In a closed traverse : ...
➣ Metallic tapes are made of : ...
➣ 30th highest hour volumes is : ...
➣ During chaining along straight line,the leader of ...
➣ Which of the following is taken into ...
➣ If ruling gradients is 1 in 20 ...
➣ The chain length which is not the ...
➣ In which of the following types of ...
❖ Take a qick MCQ Test on
➤ Pollution (Air and Noise)
➤ Miscellaneous
➤ Surveying
➤ Concrete Technology
➤ Hydrology
➤ Building Material
➤ Soil Mechanics and Foundation
➤ Strength of Material