Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ In soil stabilisation : ...
➣ Errors which remain after mistakes and systematic ...
➣ The base line is measured with : ...
➣ Length of transition curve for design speed ...
➣ For a constant value of co-efficient of ...
➣ The chain length which is not the ...
➣ The closing error in a traverse is ...
➣ What is the off-tracking of a vehicle ...
➣ While aligning a hill road with a ...
➣ For design, that length of transition curve ...
❖ Take a qick MCQ Test on
➤ Pollution (Air and Noise)
➤ Soil Mechanics and Foundation
➤ Transportation Engineering
➤ Concrete Structure
➤ Strength of Material
➤ Concrete Technology
➤ Hydrology
➤ Solid Waste and Waste Water Treatment